Sunday, December 1, 2013

The Final Update!

Well, it's been a great Semester, but at long last we're here... The Final Update! The past two weeks have been slow weeks for development because of the holiday and because our code is mostly done. These past 2 weeks the group spent all of our time working on the project together. Here is what we spent time on:

  • Bug Fixing - 2 hours (as a team)
  • Document Updating - 3 hours (as a team)
  • Playing with our sweet gym POS system on an actual touch screen - 1 hour (as a team)
This coming week we plan to put the final touches on the project, make a couple of bug fixes and finalize our submission for Sunday.

We here at team Do You Even Lift Bro? hope that this project has been as enjoyable for you as it was for us. So long, see you in the future internet!

Saturday, November 16, 2013

Week 12 status update


What we've done:
As a team:

  • Met to discuss needed updates to documents (1 hr)
  • Performed User Observation (3 hrs ea)
Andrew:
  • Bug fixing (1 hr)
Paul:
  • Implemented various critical suggestions from User Observation (3 hr)
Rob:
  • Worked on updating documents (1 hr)
Nsama:
  • Changing buttons to be consistent and larger (1 hr)
Eric:
  • Bug fixes (1 hr)
Next weeks plan:
  • Continue working on prototype
  • Fix known bugs
  • Show previous users improved system based on their feedback

Saturday, November 2, 2013

11/2/2013 Team Do You Even Lift Bro?

This was an exciting week for our team as most of our coding is done.

What we've done:
As a team:

  • Met to plan for the prototype release (1 hour)
  • Met to integrate code (1.5 hour)
Andrew:
  • Equipment Edit Panel (1 hour)
  • Fixed log-in page bug (1 hour)
  • Fixed other bugs (1 hour)
Paul:
  • Worked on membership types (1 hour)
  • Made member back end (1 hour)
  • Fixed other bugs (1 hour)
Rob:
  • Worked on bracket panel, mostly formatting (1 hour)
  • Worked in log in screen some more (1 hour)
  • Fixed other bugs (1 hour)
Nsama:
  • Worked on adding students to classes (1 hour)
  • Worked on integrating the mediator (1 hour)
  • Fixed other bugs (1 hour)
Eric:
  • Worked on formatting views (1 hour)
  • Worked on add game features (1 hour)
  • Fixed other bugs (1 hour)
Next weeks plan:
  • User testing
  • Final stretch of coding

Saturday, October 19, 2013

Week 8 Status

In recent weeks, the team has implemented most of the Customer facing front end GUI based on panels distributed between us. Having a center frame that changes view based on what JPanel is sent to it and using a Memento pattern to allow a back button set us up for splitting the system up into subsystems.


As a team:
  • Mostly discussed status updates of our implementations and assisted in coding problems
  • Discussed and began integration of our pieces for the GUI
  • Cognitive Walk-through (2 hrs)




As Individuals we: (Exact dates not remembered)
  • Rob: Finished the Login JPanel and close to finishing a Brackets JPanel for team Tournaments
    • LoginPanel = .5 hr
    • BracketsPanel = 2.5 hrs
  • Paul: Created member panels, create the initial memento layout, and setup basic outline.
    • Memento = .5 hrs
    • MainFrame = 2 hrs
    • Members = 3hrs
  • Andrew: Worked on model for equipment and worked on the various equipment views
    • Equipment Model = .5 hrs
    • EquipmentViews = 2.5 hours
  • Nsama: Worked on model for the classes and class GUI Elements
    • Classes Model = ?
    • Classes GUI = ?
  • Eric: Worked on GridButtonView, GridMenuItems, LeagueView, and Status pages.
    • GridButtonView = 2hrs
    • GridMenuItem = .5 hr
    • LeagueView = .5 hr
    • StatusPages = 3 hrs


We also scheduled the following for this week:

  • Go through heuristic evaluation 
  • Create Test Plan
  • Continue Working on Prototype/ Integration

Saturday, September 21, 2013

This week the team worked on the design of the system and the SRS document.

As a team:
  • We hashed out the overall design of the system (2 hours)
  • Finished the SRS document (3 hours)
  • Setup GitHub (10 minutes)

As Individuals we:
  • Each did prototypes of the views using the pencil project (2 hrs/person)
  • Designed individual UI’s to be compared as a group (2 hrs/person)

We also scheduled the following for this week:

  • Rob: Start working on the code for the login page
  • Paul: Start working on the toolbar (buttons, images and memento)
  • Andrew: Start looking into the database
  • Nsama: Start working on the data structures
  • Eric: Start working on the standard layout menu

Saturday, September 7, 2013

9/7/2013 Blog entry # 1

What did we do this week?
Group
  • General design meeting -1hr
  • Met each other and exchanged contact info - 30min
  • Won in class activity - 1hr
  • Merged individual UI ideas - 1hr
  • Spoke to user for initial requirements and designs - 1hr

Individual
  • Paul - Member view design - 1hr
  • Robert - Experimental GUI design -1hr
  • Andrew - Equipment view design-1hr
  • Nsama - Classes view design-1hr
  • Eric - leagues view design-1hr

Next Week
  • Standardized window design - 1hr
  • Create a prototype interface document - 2hr
  • Cover prototype document with user - 1hr
  • Work on SRS document - 2hr